YACONTO.COM

YACONTO Videoblog

A video about ATOMMASH OJSC (English)

More videos

Interesting fact

The production area of Atommash amounted to nearly 6 million square meters. 500 Milan Cathedrals could accomodate on that territory.

More interesting facts

A meeting with Chief of the General Staff of RF Armed Forces Anatoly Kvashnin ↓

02.12.2008

Anatoly Kvashnin, General of the Army

During my meeting with the Commander-in-Chief of the Russian Navy, Admiral of the Fleet Vladimir Kuroedov, which took place on the Constitution Day of Russian Federation that took place on 12.12.2001, he received a business-related phone call from the Chief of the General Staff of the Russian Armed Forces - First Deputy Defense Minister of RF - General of the Army Anatoly Kvashnin. During their discussion, Kuroedov informed him about my presence and our discussion around the implementation of the YACONTO Integrated Program. Knowing YACONTO from a positive side, Kvashnin asked Kuroedov to invite me for an immediate personal meeting to get more details on the Program he was already aware of. During our meeting with Anatoly Kvashnin in the General Staff of the Armed Forces of RF I gave him several 500-sheet binders of materials and documents on the promising Program, which he studied; we had several meetings thereafter.

What has positively struck me was that Anatoly Kvashnin, unlike other high-ranking officials I came across, carefully studied the provided materials personally, and therefore it was a pleasure to discuss the matter of the implementation of the Program with him, since the Program was necessary in order to ensure the defense capability and socio-economic development of Russia. Chief of the General Staff of AF RF Kvashnin has expressed his stately position in respect of the YACONTO Integrated Program by putting his signature on the Letter from the Commander-in-Chief of the Russian Navy Kuroedov to the Russian Minister of Defense Sergey Ivanov (out. №707/T-4641 of 02.12.2001). However, active anti-state plots carried out around the Program by the irresponsible officials of the Russian Ministry of Transport and their very influential patrons in the Russian Government and the Presidential Administration of RF, dragged on the implementation of the YACONTO Integrated Program till present time. There are many reasons for that and it's a complex topic worthy of considering and investigating. But the most important reason is the premeditated bankruptcy of Russia's nuclear engineering flagship Atommash OJSC. There has always been a connection between the Program and Atommash, and it still persists. More detailed information can be found in different sections of this website and www.yaconto.ru

Sergey Yakunin, President of YACONTO LLC

 

скачать софт бесплатно скачать фильмы качественные шаблоны dle скачать